Mon–Fri 8:00–18:00 (866) 641-1069 20501 Ventura Blvd #135
Flip It Homes project near Sherman Oaks, California
Central San Fernando Valley

Sherman Oaks
Renovations, ADUs & Custom Builds

Sherman Oaks blends dense flats near the 101 with hillside homes climbing toward Mulholland. Lot size varies enormously block to block, so feasibility work matters more here than almost anywhere.

10+
Years in business
150+
Completed projects
4.9
Average rating, 159 reviews
A+
BBB accredited
Building in Sherman Oaks

Your Sherman Oaks design-build contractor

A mix of compact postwar homes and larger hillside properties — heavy demand for kitchen openings, bathroom remodels, and garage-conversion ADUs on tighter parcels.

Every Sherman Oaks project we take on is fully permitted, inspected, and warrantied — with permits issued by the City of Los Angeles (LADBS). You get one contract covering design, engineering, permits, and construction, an itemized proposal before demo begins, and a dedicated project manager who answers the phone.

Region
Central San Fernando Valley
Permits issued by
the City of Los Angeles (LADBS)
From our office
Woodland Hills — Mon–Fri 8:00–18:00
Recent Work

Projects in Sherman Oaks

Sleek Studio ADU Garage Conversion — Sherman Oaks, CA

Sleek Studio ADU Garage Conversion

Sherman Oaks, CA
Studio Layout ADU Garage Conversion — North Hollywood, CA

Studio Layout ADU Garage Conversion

North Hollywood, CA
2-Bedroom ADU Garage Conversion — Tarzana, CA

2-Bedroom ADU Garage Conversion

Tarzana, CA
2-Bedroom ADU Garage Conversion — Northridge, CA

2-Bedroom ADU Garage Conversion

Northridge, CA
How We Work

A process built on clarity

01

Consultation

We walk your Sherman Oaks property, listen to your goals, and talk honestly about budget and timeline.

02

Design & Permits

Drawings, an itemized proposal, and plan check with the City of Los Angeles (LADBS) handled for you.

03

Construction

Sequenced trades, a dedicated project manager, and a clean site at the end of every day.

04

The Reveal

Final inspection, a punch-list walkthrough, and a warranty that stands behind the work.

Common Questions

Sherman Oaks FAQ

Do you actually work in Sherman Oaks?

Yes — Sherman Oaks is inside our core service area and we work there regularly. Our office is at 20501 Ventura Blvd #135 in Woodland Hills, so crews and project managers reach Sherman Oaks easily, which matters for site supervision and schedule reliability.

Who issues building permits for a Sherman Oaks project?

Permits for work in Sherman Oaks are issued by the City of Los Angeles (LADBS). We prepare the drawings, submit for plan check, and coordinate every inspection through final sign-off, so you never deal with the counter yourself.

Can I build an ADU in Sherman Oaks?

In most cases yes. California ADU law applies statewide, and both garage conversions and detached ground-up units are generally permitted on single-family lots, subject to local standards. We run a feasibility review on your specific parcel before you spend anything on design.

How long does a Sherman Oaks project take?

It depends on scope: bathrooms typically run three to five weeks of construction, kitchens six to ten, and whole-home renovations four to nine months plus plan-check time. You get a stage-by-stage schedule with your itemized proposal.

Do you provide a written, itemized quote?

Always. After walking the property we provide a detailed line-item proposal so you can see exactly where the budget goes and adjust scope before committing. Consultations in Sherman Oaks are free and carry no obligation.

Ready to start your Sherman Oaks project?

Book a free, no-pressure consultation. We'll walk your space, talk through options, and give you a clear, itemized proposal.